Answer :
Option D - $22.64
Activity Overhead cost Total expected activity Activity rate Activity of fancy Overhead assigned
Supporting direct labor $468,000 36,000 $13 25,000 $325,000
Setting up machines $222,180 1,932 $115 908 $104,420
Parts administration $397,020 1,018 $390 350 $136,500
Total overhead cost assigned $565,920
Calculations of per unit overhead cost assigned to product fancy:
Overhead cost per unit = Total overhead cost assigned / Annual production
= $565,920 / 25,000
= $22.64
Answer is option D - $22.64
The time period administration, as used inside the context of government, differs in keeping with the jurisdiction below which it operates. In standard terms, administration can be described as a selection-making frame. In American usage, the time period generally refers back to the govt branch below a particular president (or governor, mayor, or different local executive); or the term of a selected executive; as instance: "President Y's management" or "Secretary of defense X during President Y's management." it is able to additionally suggest an executive branch enterprise headed with the aid of an administrator, as the countrywide Aeronautics and space management (NASA), Small enterprise administration or the national data and statistics management.
Learn more about administration here
https://brainly.com/question/22972887
#SPJ1