The following diagram shows a 4-step process that begins with Operation 1 and ends with Operation 4.

Based on the operations and their times, the capacity of this process is 10 per hour and the action that would yield the greatest increase would be 2. increase operation 2 by 14%.
The capacity of the process is the least operation time in the process which is 10/ hr.
Check all the alternatives given. The alternative with the lowest capacity is best.
Increase operation 1 by 12%:
= 11 x (1 + 12%)
= 12.32 per hour
Increase operation 2 by 14%:
= 10 x (1 + 14%)
= 11.4 per hour
Increase operation 3 by 10%:
= 12 x (1 + 10%)
= 13.2 per hour
The best alternative is therefore to increase operation 2 by 14%.
Find out more on process capacity at https://brainly.com/question/20396505.