Answer :
Based on the information given the predetermined overhead rate is 31.89 per direct labor hour.
Predetermined overhead rate
Using this formula
Predetermined Overhead rate = Estimated manufacturing overhead / Estimated total labor hours
Let plug in the formula
Predetermined Overhead rate = [$1,026,260 + (46,000×6.25)] / 41,200
Predetermined Overhead rate =1,313,760/ 41,200
Predetermined Overhead rate = 31.89 per direct labor hour
Inconclusion the predetermined overhead rate is 31.89 per direct labor hour.
Learn more about predetermined overhead rate here:https://brainly.com/question/26372929