Please solve this ratio and proportion

Step-by-step explanation:
a) The scale 3:24 = 1:8 so if the scale drawing is 5" tall, then the building's actual height is 5×8 = 40 ft.
b) The ratio of the cement to sand is 1:3 so if you have 24 buckets of sand, that means you need 24/3 = 8 buckets of cement.
c) The ratio at which the money is to be distributed is 5:2:4:3. So the money is to be partitioned into 14 (=5+2+4+3) parts so that A get (5/14) of the money, B gets (2/14), C gets (4/14) and D gets (3/14). If C gets R1000 more than D then we can write
[tex]C = D + 1000 \Rightarrow \frac{4}{14}M = \frac{3}{14}M + 1000[/tex]
Solving for M, which is the total sum of money, we get
[tex]\frac{1}{14}M = 1000 \Rightarrow M =R14000[/tex]
Now that we know how much money is involved we can now solve how much money B gets:
[tex]\frac{2}{14}M = (\frac{1}{7})(14000) = R2000[/tex]