Answer :
Answer:
- (700 + 51q)/4q
Step-by-step explanation:
Given costs:
- (200 + 13q)/q and (300 + 25q)/2q
Sum of the costs:
- (200 + 13q)/q + (300 + 25q/2q) =
- (400 + 26q)/2q + (300 + 25q)/2q =
- (700 + 51q)/2q
Average cost is sum divided by number:
- (700 + 51q)/2q ÷ 2 =
- (700 + 51q)/4q
