Materials Handling Costs are $12,000, setup costs are $21,000. There were 240 material moves, and 15 setups. Product A required 180 material moves, and Product B used the rest of the material moves. Product A required 9 setups, Product B used the rest of the setups. Using either method, how much total cost would be allocated to Product A? $21,600 $12,600 O $1,400 $9,000 $8,700