BRANDIWALLACE669GO BRANDIWALLACE669GO Engineering Answered when connected to a 120 v (rms), 60-hz power line, a load absorbs 4kw at a lagging power factor of 0.8. find the value of capacitance, c, necessary to raise the power factor to 0.95 lagging.